a dedicated ‘crash’ channel on a two-way radio). An important direct aspect of communication, is that between the crane operator and Slinger/Signallers, as well as facilitating communication between multiple crane operators (e.g. On smaller sites, the site management will need to ensure that all are aware of the lifting operations and exclusion zones. On large sites, with multiple cranes, the communication will be facilitated by the Crane Coordinator. Lifting should never be conducted over public areas, and within construction sites, there should be clear exclusion zones.Īn important, and sometimes overlooked, aspect of safe lifting operations is communication. A teleporter may be very flexible, but they have a limited capacity and can easily become unbalanced if operated by an inexperienced driver.Īs with all lifting operations, the potential for falling loads is a significant hazard. A mobile crane will require confirmation that the ground conditions are sufficient to support the crane and load (again, a temporary works design may be required). For example, a tower crane will require a temporary works design for its base. There are further management controls required for some of the specific hazards associated with the different lifting appliances. This is accepted for fulfilling the role of Appointed Person and also Crane Supervisor and/or Crane Coordinator. The training for these roles is usually a three day Appointed Person (Lifting Operations) course, as there is no Solas CSCS training requirement. On large projects, these roles will be fulfilled by different people, but on smaller sites a single person may be responsible for developing the lift plan and supervising the lifts.
![crane lift study example crane lift study example](http://www.maximumreach.com/Tips_March03_files/image004.jpg)
CRANE LIFT STUDY EXAMPLE MANUAL
In the reduction of manual handling hazards and the transfer of construction hazards to a controlled factory environment (for pre-fabricated components), there is the introduction of the (low probability) high hazard potential lifting operations. precast concrete beams/columns/walls, bathroom pods, modular houses
CRANE LIFT STUDY EXAMPLE PROFESSIONAL
![crane lift study example crane lift study example](https://hsseworld.com/wp-content/uploads/2020/10/Lifting-Plan-Audit-Checklist.jpg)
![crane lift study example crane lift study example](https://s3.studylib.net/store/data/008957951_1-e70a8d1fe22eebcd8f00e6e4503f8bd4.png)
Bund/Pipeline Integrity Testing and Design.Fire Safety Audits and Fire Risk Assessments.